INDUSTRIAL / Pro Core

Spread over 137 acres, this railcar unloading facility went up quickly. MBA worked with the State to design highway access and other requirements. An additional 2 miles of track were installed with 4 switches where entire unit trains can unload. There are twelve 300,000 pound silos with scales and a rail unloading transfer system with electrical distribution for the entire site.